KVH Industries TracVision G4 User Manual Page 109

  • Download
  • Add to my manuals
  • Print
  • Page
    / 155
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 108
3. Unplug the Molex connectors from the RF PCB
(see Figure 5-6).
4. If the top RF cable is not already marked, label it
so that the RF cables can later be plugged into the
proper positions on the new PCB.
5. Using a
7
16" wrench, carefully remove the two RF
cables from the RF PCB. Hold the RF connector
ferrules while loosening the connectors to avoid
excess stress on or twisting of the cables (see
Figure 5-7).
6. Using a
1
4" nut driver/socket, remove the four 1
1
16"
standoffs and set aside.
7. Remove the old RF PCB.
8. Install the new RF PCB, making certain to align
the PCB so that the RF connectors are facing
inward (see Figure 5-1 on page 105).
9. Apply a drop of Loctite to one end of the four 1
1
16"
standoffs. Install the four standoffs, Loctite-
applied ends facing the RF PCB. Secure in place
using the nut driver.
10. Reattach the RF cables, making certain to connect
them in their original positions (marked cable on
top).
11. Reattach the Molex connectors to the RF PCB.
12. Insert the split rubber grommet surrounding the
Molex connector cables into the small slot on the
new RF PCB cover.
13. Secure the RF PCB cover using the nuts and
washers removed in Step 2.
54-0147
110
TracVision G4 Technical Manual
Standoff
RF Connectors
Molex Connectors
Figure 5-6
RF PCB Connector Locations
(Rear View)
Failure to hold the ferrules tightly
while loosening the RF connectors
can result in damage to the cables
and reduce the signal quality.
Figure 5-7
RF Cable Ferrules
Page view 108
1 2 ... 104 105 106 107 108 109 110 111 112 113 114 ... 154 155

Comments to this Manuals

No comments